All Radar picks

X OPPORTUNITY RADAR / DISPATCH

The FCC Wants to Move Electronics Testing Out of China

The FCC is moving to bar China-based labs from certifying U.S. electronics. In 2025, 82% of devices were tested there. Less than 4% were tested here.

Information Overload
2 min readSources
A vast conveyor crowded with phones, laptops, routers and cameras climbs from an industrial test hall toward one tiny inspection booth beneath an oversized approval stamp.
AI-generated editorial illustration

Before a phone, router, camera or baby monitor can be marketed in the United States, it generally has to pass through an FCC-recognized test lab. On October 7, the Federal Communications Commission said it will vote on October 29 on final rules limiting that recognition to labs in the United States or in economies that give U.S. labs reciprocal treatment. Reuters reports that the rule would bar every China-based lab from the process.[1][2][6]

The scale is the useful part. FCC Chair Brendan Carr says 82% of electronics were tested in China in 2025. Less than 4% were tested in the United States.[1][2][3][4][6]

Washington spent years moving the inspection desk overseas. It has now discovered national security, reciprocity and the political pleasures of saying onshore. Splendid. The desk still needs people, facilities and enough throughput to handle the pile of laptops currently arriving on the conveyor belt.

The FCC says the rule would take effect December 2028. The agency is also proposing a faster approval path for devices tested in the United States or other reciprocal, lower-risk economies. That runway matters: this is not evidence of an immediate product shortage, and the Commission has not yet taken the final vote.[1][2][6]

In 2025, the FCC barred labs owned or controlled by foreign adversaries. The new order would broaden the boundary from ownership to geography and reciprocity, converting a security concern into a supply-chain relocation project.[2][5][6]

Fact and inference

The facts are the October 29 vote, the proposed December 2028 effective date, the FCC's 82% and under-4% figures, and the reciprocal-economy test. The inference is that moving such a concentrated certification pipeline will create a capacity and pricing problem unless domestic and allied labs expand quickly.[1][2][6]

Washington wants to move the inspection desk. Whether replacement capacity arrives in time is the industrial-policy question.

CORRECTIONS & UPDATES.

Correction ·
Clarification, October 8, 2026: The title and closing passage now reflect that the rules remain proposed ahead of the October 29 vote. The effective-date reference is December 2028; the cited reporting did not establish the exact day.

FOLLOW THE SOURCES.

Checked Oct 8, 2026. Numbered references point to the evidence behind factual passages. Commentary is our own.

  1. Chairman Carr Proposes Device Test Lab Onshoring, Reciprocity Rules (opens in a new tab)Federal Communications CommissionBack to cited passage
  2. US FCC to vote to ban all Chinese labs from testing US electronics (opens in a new tab)ReutersBack to cited passage
  3. FCC announces test-lab onshoring and reciprocity proposal (opens in a new tab)Federal Communications Commission on XBack to cited passage
  4. Brendan Carr statement on electronics test labs (opens in a new tab)FCC Chair Brendan Carr on XBack to cited passage
  5. US telecom agency votes to expand tech crackdown on China (opens in a new tab)ReutersBack to cited passage
  6. US FCC to vote to ban Chinese labs from testing US electronics (opens in a new tab)Reuters via Investing.comBack to cited passage
Technology policyNational securitySupply chainsElectronicsUnited States-China relationsFederal Communications Commission
Back to the latest picks